So let's examine the MYTHS -vs- FACTS
regarding the seawall fix:
MYTH: The terms "seawall" and "retaining wall" are synonymous.
FACT: That is blatantly false. retention walls are built above the level of the structures they are built to protect. Anyone can see that our seawalls are built below the foundations of our homes. The seawalls are built to stop the abutting properties from eroding into the canals.
Retaining Wall |
Seawall |
MYTH: Those seawalls will help protect us during a flood.
FACT: From a P.E. (Professional Engineer) with 25 years of flood expertise: "Those canals make your homes more vulnerable to a flood from a surge as they bring the source of the surge nearer to your homes." Land and retaining walls would slow or stop a surge. The open water in the canals will continue to grow as the wind whips the water from the bay, as there is nothing there to slow it.
MYTH: Without the canals, there would be no MiraBay - as they are a requisite for our surface water drainage.
FACT: The canals are a necessary part of our water management system because the developer chose to make it so. There were alternatives; but the canals maximized the lot prices.
ANOTHER FACT: The Florida statute that created the CDD concept (Title XIII, Chapter 190 for those desiring to study further. Here's he link: FL Statute for CDDs) was designed so that the cost for the infrastructure of a development would be born by the property owners (members of the CDD) so the developer could sell the lots at a lesser price. I have seen no evidence that Newland - operating as Terrabrook - which protects the parent company from most litigation - ever discounted any lots in MiraBay!
MYTH: Every property owner in Mira Bay benefits from the canals in numerous ways.
ANOTHER FACT: The primary beneficiary of the canals to date has been the developer through premiums levied on waterfront lots! The developer fronted the monies for the infrastructure, including the seawalls; and then they sold everything - except the rights of way to the water in the canals - to the CDD. So, after recovering their costs, they were paid again for those seawalls as a part of the lot premium!
ANOTHER FACT: We must do something. And, even though there is no doubt that canal front homes benefit most from the seawalls, all of us will see depreciation in property values if we fail to fix the problem. If those waterfront properties lose value, we all lose value.
ANOTHER FACT: MiraBay property owners will see property values drop regardless, due to an increase in the CDD fees - as planned. In fact, according to the bond underwriter, the most expensive option could increase our CDD fees by 43%! And, you don't have to be a "Ben Carson", to realize that CDD increase would result in a significant drop in everyone's property value! A 20% drop, initially would not be surprising. And, as the FOR SALE signs keep popping up, the values will likely spiral downward! Imagine: Your $300,000 town home drops $60,000 almost overnight; your $1.5 million property drops $300,000!
MYTH: (IMPLIED)The more expensive option (Option 3) will be the less expensive option over time, as it will last much longer.
FACT: Our own engineers, the Langan group stated at a previous meeting that either option will outlast most of us.
MYTH: The rip rap fix (Modified Option 1) narrows the navigable waterways of the canals.
FACT: The proposed rip rap will be well inside the reach of the current docks. The waterways will not be narrowed.
MYTH: The rip rap would expose small watercraft operators to increased danger.
FACT: That could be the case if other steps are not taken to mitigate the exposure to danger. There are various options that may be considered. More on that at a later date.
MYTH: The rip rap will increase our dredging costs.
FACT: Not one dredging company has indicated that it will cost more to dredge if the rip rap is used!
ANOTHER FACT: Rip rap is natural. Purists would much prefer the natural look of rip rap versus a seawall composed only of artificial materials!
Rip Rap against seawall |
MYTH: Assessing all property owners is the only way to pay for the necessary fix.
FACT: I've got an idea that may result in no cost to the CDD (us)! I'll expound on that after I get closer to that solution . . .
MYTH: It's already decided that the most expensive option will be chosen.
FACT: I am somewhat certain that the only Board member who has firmly decided on Option 3 is the Chairman, Bob Collins - who has taken it upon himself to manage this project. Is his position influenced by the fact that his home is on a canal, or is he looking out for all members of the CDD (which is his job)? Even the P.E., with whom I consulted about the flood protection misrepresentation, described the communications released to us as "PROPAGANDA to promote option 3!"
It takes 3 of the 5 Board members to vote to spend our money, and it's obvious that not all are yet in agreement! Let them know how you feel! They can be voted out of office if they fail to protect our interests!
ANOTHER FACT: Our CDD spent years in litigation - filing suit against ALMOST every entity involved in the original design and installation of the seawalls. But, which party wasn't named in the suit? Newland Communities (legally known as Terrabrook.) Was it because they controlled the CDD then? (Kind of a rhetorical question, huh?)